Projects

Things I built

The pinned cards below are public and MIT licensed. Clone them, open an issue, take what helps. Product work further down is mostly private client code, so those cards link nowhere on purpose.

11public repos, MIT
7Flutter and Dart packages
82civil projects, 2021 to 2025
Open source

Pinned and public

Packages and tools I build and maintain on my own time. Stars and last push are read live from GitHub.

All on GitHub

Flutter, Dart and Android

Structural and civil engineering

Product work

Shipped

Mostly private client code, so only the live products link anywhere.

Shipped

Koriru Coffee

MVP for a coffee business, web storefront + internal dashboard: system structure, responsive UI, order management flow. Live at koriru.coffee.

Freelance · koriru.coffee

StreamFusion

Spotify-style music streaming app, playlists, search, and playback UI built in TypeScript.

TypeScript Private repo

UtilityBox

Multi-feature Flutter app in Clean Architecture, code-gen-free reactive state with Riverpod 3, offline-first via Hive and Dio.

Flutter Private repo

Cuacaku

Weather mobile app in Flutter, forecasts and local conditions, built mobile-first.

Flutter Private repo
Civil engineering, project log

82 projects, two countries

81 delivered across Central Sulawesi between 2021 and 2025: public buildings, offices, sports facilities, roads, drainage, and landscape works for provincial government agencies. Plus international consultancy work abroad: embankment, drainage & box culvert design in Cova Lima, Timor-Leste (2023).

The civil engineer era

Roles span the full lifecycle: site supervision and quality control during construction, design and DED review before tender, planning and cost analysis at inception, and HSE oversight throughout. Sorted by completion date. Open any row for scope, responsibilities and outcome.

20251 project

  • Construction of the Central Sulawesi Provincial Grand MosqueLead Construction SupervisorPaluJan 2025 to Apr 2025

    Scope. Took over construction supervision on a strategic provincial public building project after the previous supervision team left the role vacant.

    Responsibilities
    • Led routine site inspections to verify compliance of works with technical specifications and structural safety standards
    • Reconstructed missing technical supervision reports, ensuring documentation was accountable and audit-ready
    • Independently verified all variation orders/addenda against actual site conditions

    Outcome. Closed the supervision gap with accountable, reconstructed technical reporting. Design-to-site discrepancies were mitigated before they could affect structural safety.

    Buildings

202433 projects

  • Workstation Power Outlet InstallationDinas Cipta Karya & SDA Prov. SultengMEP Planning Engineer & SupervisorPaluNov 2024 to Dec 2024

    Scope. Planned and supervised workstation power outlet installation, focused on efficient layout and electrical safety.

    Responsibilities
    • Prepared detailed engineering design (DED), cost estimate (HPS), and ergonomic installation layout for workstations
    • Supervised electrical works to high safety standards

    Outcome. Unit shortfalls were resolved through contractor negotiation. Installation delivered a tidy, safe result compliant with electrical standards.

    Interiors and fit-out

  • Sports Field RehabilitationSiranindi Official ResidenceSports Facility Rehabilitation EngineerPaluOct 2024 to Dec 2024

    Scope. Planned sports field rehabilitation within the official residence complex to upgrade recreational facilities.

    Responsibilities
    • Assessed existing field conditions and identified damage
    • Prepared rehabilitation DED covering surface repairs and drainage
    • Planned upgrades to supporting facilities such as lighting and grandstands

    Outcome. Rehabilitation planning was completed for the sports field, setting up an upgrade in recreational facilities for complex residents.

    Sports and public

  • Signage & Wayfinding WorksDinas Cipta Karya & SDA Prov. SultengPlanning Engineer & Installation SupervisorPaluNov 2024 to Dec 2024

    Scope. Managed procurement and installation of indoor and outdoor signage for a comprehensive wayfinding system.

    Responsibilities
    • Conducted a signage needs survey across the entire office area
    • Prepared DED and cost estimate (HPS), and supervised installation with cross-unit coordination

    Outcome. Cross-unit coordination was completed, delivering a fully functional, integrated wayfinding system.

    Interiors and fit-out

  • Secretary's Office Interior RenovationDinas Cipta Karya & SDA Prov. SultengLead Planner & Site SupervisorPaluAug 2024 to Dec 2024

    Scope. Managed the full interior renovation cycle from planning (DED/HPS) through construction supervision, delivering a functional, representative workspace.

    Responsibilities
    • Prepared comprehensive DED, HPS, technical specifications, and execution schedule
    • Supervised ceiling, backdrop, and electrical works to high quality standards
    • Integrated local ornamentation per user requests without compromising technical accuracy

    Outcome. User request changes were managed effectively without technical deviation. The workspace was completed functional and representative, meeting the target.

    Interiors and fit-out

  • Painting & Road Marking WorksDinas Cipta Karya & SDA Prov. SultengPlanning Engineer & Site SupervisorPaluOct 2024 to Dec 2024

    Scope. Planned and supervised fence/parking area painting and road marking, with a clear layout and complete as-built documentation.

    Responsibilities
    • Prepared DED, HPS, and a marking layout integrated with vehicle circulation
    • Supervised execution and produced accurate as-built documentation

    Outcome. Scheduling was synchronized with parallel road works. Circulation and parking became better organized under a clear marking system.

    Roads and bridges

  • Office Building MaintenanceDinas Cipta Karya & SDA Prov. SultengMaintenance Planning EngineerPaluJul 2024 to Dec 2024

    Scope. Carried out survey and maintenance planning for the office building to sustain operational function.

    Responsibilities
    • Identified priority maintenance items through condition survey
    • Prepared maintenance plan and cost estimate
    • Documented technical data as the basis for procurement

    Outcome. The maintenance program was structured systematically, prioritized by urgency and operational impact.

    Buildings

  • Mezzanine ProcurementDinas Cipta Karya & SDA WarehouseMezzanine Design & Procurement EngineerPaluNov 2024 to Dec 2024

    Scope. Planned procurement and installation of a mezzanine to optimize warehouse storage capacity.

    Responsibilities
    • Designed mezzanine structure with safe load calculations
    • Calculated material requirements and cost estimate
    • Supervised installation to structural safety standards

    Outcome. The installed mezzanine significantly increased warehouse storage capacity without expanding the building footprint.

    Interiors and fit-out

  • Lift Lobby Backdrop WorksDinas Cipta Karya & SDA Prov. SultengDesign Engineer & Quality ControllerPaluAug 2024 to Dec 2024

    Scope. Designed and supervised installation of decorative lift lobby backdrop panels with strict quality control and HSE compliance.

    Responsibilities
    • Prepared DED, HPS, and technical specifications for decorative works
    • Supervised HPL finish installation to a high aesthetic standard
    • Enforced HSE protocols and documented violations to drive continuous improvement

    Outcome. HSE was enforced consistently despite site-level resistance. Visual quality met the design intent, with complete documentation.

    Interiors and fit-out

  • Construction of the Lelean Nono Terminal FenceToli-Toli RegencyDesign Engineer & HSE ExpertToli-ToliJul 2024 to Dec 2024

    Scope. Continued the 2023 fence planning with budget and design adjustments, and served as the project's HSE expert.

    Responsibilities
    • Revised and finalized drawings and budget plan
    • Supervised terminal fence construction through the November-December implementation phase
    • Served as project HSE expert, ensuring compliance with government safety standards

    Outcome. Completed the project safely with no recorded incidents. Established a safety culture despite local workforce resistance to HSE protocols.

    Roads and bridges

  • Interior Phase IIConference & Archive Rooms, Dinas Cipta Karya & SDA Prov. SultengLead Planner & Construction SupervisorPaluAug 2024 to Dec 2024

    Scope. Led continued 4th-floor interior rehabilitation covering conference, archive, and support rooms, with full control from design through execution.

    Responsibilities
    • Prepared DED, HPS, and technical specifications for the full scope of works
    • Supervised finishing, furniture, and multimedia system works to a high quality standard
    • Introduced a pulley-based material-lifting method to secure working-at-height safety

    Outcome. HSE standards were maintained throughout material lifting. Rooms met operational needs with optimal finishing quality.

    Interiors and fit-out

  • Continued Infrastructure ImprovementBuilding & Road Works, Dinas Cipta Karya & SDA OfficeInfrastructure Continuation SupervisorPaluDec 2024 to Dec 2024

    Scope. Completed remaining infrastructure improvement works to meet the year-end completion target.

    Responsibilities
    • Identified and prioritized outstanding unfinished works
    • Supervised accelerated execution to meet the deadline
    • Ensured quality was not compromised despite the tight timeline

    Outcome. The project was completed within the target timeframe, achieving full infrastructure scope with quality maintained.

    Roads and bridges

  • e-Bantekbgn Digital Service PlatformTechnical Assistance Digital Platform LeadPaluOct 2024 to Dec 2024

    Scope. Developed a digital platform for state building technical-assistance services, integrating standardized cost formulas.

    Responsibilities
    • Designed the digital platform's system architecture and workflow
    • Integrated previously developed standard cost formulas
    • Coordinated development with the IT team for implementation

    Outcome. The digital platform concept was successfully developed, setting up more efficient, standardized technical assistance service province-wide.

    Other

  • Continued Infrastructure Upgrade (Drainage Cover Procurement)Dinas Cipta Karya & SDA OfficeDrainage Infrastructure EngineerPaluNov 2024 to Dec 2024

    Scope. Continued the infrastructure upgrade program, focusing on drainage cover procurement for pedestrian safety and aesthetics.

    Responsibilities
    • Prepared technical specifications for drainage covers rated to traffic load
    • Calculated procurement quantities and cost estimates
    • Supervised installation to pedestrian safety standards

    Outcome. Installed drainage covers improved pedestrian safety and the visual quality of the walkway within the office complex.

    Drainage and water

  • DED ReviewCentral Sulawesi Provincial DPRD Plenary BuildingSenior Technical Reviewer (DED & Budget)PaluDec 2024 to Dec 2024

    Scope. Audited the DED document's technical and budget content to eliminate administrative errors and cost items lacking technical justification.

    Responsibilities
    • Audited consistency between drawings, specifications, and budget to confirm the accuracy of the planning documents
    • Identified irrelevant cost items, including periodic supervision fees that should not have been charged
    • Prepared correction notes and improvement recommendations as the basis for revising the DED document

    Outcome. Eliminated budget waste risk at the planning stage. The DED was certified fit for use with no major revision needed at the construction stage.

    Survey and design

  • Rehabilitation & Conversion of the Canteen BuildingDinas Cipta Karya & SDA Prov. SultengLead Planner & Rehabilitation SupervisorPaluNov 2024 to Dec 2024

    Scope. Engineered the conversion of a former emergency command post into a functional canteen through comprehensive rehabilitation of the roof, interior, and landscape.

    Responsibilities
    • Prepared DED, HPS (owner's cost estimate), and technical specifications for the building conversion works
    • Supervised roof repair and interior layout works for the canteen function
    • Designed supporting landscape works to improve user comfort

    Outcome. Managed the variation order strategically to add value. The canteen was made ready for operation with complete, comfortable facilities.

    Buildings

  • Canopy & Rear Fence WorksDinas Cipta Karya & SDA OfficeCanopy & Fence Construction EngineerPaluOct 2024 to Dec 2024

    Scope. Planned and supervised construction of a canopy and rear fence to complete the office facilities.

    Responsibilities
    • Prepared the canopy DED with a structurally safe, visually cohesive design
    • Planned fence construction integrated with the security system
    • Supervised execution to a high quality standard

    Outcome. Completed the canopy and fence, rounding out the office facilities. The rear area is now sheltered and secure.

    Buildings

  • DED ReviewCentral Sulawesi Provincial BAPENDA Meeting RoomTechnical Reviewer & Cost AnalystPaluNov 2024 to Dec 2024

    Scope. Conducted a rapid DED review and bill of quantities verification to confirm accuracy, cost efficiency, and compliance with the latest tax regulation (12% VAT).

    Responsibilities
    • Validated architectural/technical drawings and cross-checked consistency across all planning documents
    • Recalculated the bill of quantities and identified a potential cost efficiency of 3.27%
    • Applied the 12% VAT adjustment across all line items while holding net efficiency at approximately ±0.8%

    Outcome. Preserved cost efficiency despite the tax rate increase. The document was made ready for construction with no major revision required.

    Survey and design

  • Rehabilitation of Aspidsus Official ResidenceKejaksaan TinggiLead Planner & Phased Construction SupervisorPaluFeb 2024 to Dec 2024

    Scope. Prepared survey, DED, bill of quantities, and technical specifications for the official residence rehabilitation, structured across two phases due to budget constraints.

    Responsibilities
    • Carried out a site survey and condition assessment of the existing official residence
    • Prepared the DED, cost estimate (bill of quantities), and technical specifications as the basis for execution
    • Planned two-phase construction: Phase 1 prioritizing essential works, with Phase 2 able to proceed without disrupting Phase 1

    Outcome. The project was accelerated and completed 100% one week ahead of the deadline, despite entering a critical contract stage (90% of the schedule elapsed).

    Buildings

  • Renovation of the Asbin Official ResidenceCentral Sulawesi High Prosecutor's OfficeLead Planner & Rehabilitation EngineerPaluJun 2024 to Dec 2024

    Scope. Prepared a comprehensive plan for the renovation of the High Prosecutor's Office Assistant for Development's official residence.

    Responsibilities
    • Carried out an existing-condition survey and damage assessment
    • Prepared the DED, bill of quantities, and technical specifications for the rehabilitation
    • Planned the work sequence to minimize operational disruption

    Outcome. Delivered a complete set of planning documents, ready for use as the basis for construction.

    Buildings

  • Facade ACP InstallationDinas Cipta Karya & SDA Prov. SultengFacade Engineer & Quality SupervisorPaluOct 2024 to Dec 2024

    Scope. Managed planning and supervision of ACP installation on the main facade columns, mitigating material delay risk.

    Responsibilities
    • Prepared DED and HPS for the aluminum composite panel facade works
    • Supervised installation and quality control to a high finishing standard
    • Mitigated material delay and quality deviation through proactive coordination with the supplier

    Outcome. Achieved 84.17% of the contract target within the contract deadline. The remaining works were completed in early January without compromising quality.

    Interiors and fit-out

  • Building & Road Infrastructure ImprovementDinas Cipta Karya & SDA OfficeInfrastructure Improvement Project LeadPaluFeb 2024 to Oct 2024

    Scope. Led a comprehensive infrastructure improvement project covering building and road repairs across the office complex.

    Responsibilities
    • Prepared infrastructure improvement master plan, prioritized by urgency
    • Coordinated multiple work packages in parallel
    • Monitored progress and ensured quality met standards

    Outcome. Infrastructure improvements were completed comprehensively. The office complex saw a significant upgrade in function and appearance.

    Roads and bridges

  • Landscape Upgrade Phase IICentral Sulawesi Provincial BPKAD OfficeSenior Landscape EngineerPaluAug 2024 to Oct 2024

    Scope. Continued Phase II landscape works, focusing on the garden area and supporting facilities.

    Responsibilities
    • Revised and developed the DED based on the Phase I evaluation
    • Supervised implementation of further landscape elements to a high quality standard

    Outcome. Maintained design continuity, with Phase I and Phase II fully integrated.

    Sports and public

  • Billboard Structure WorksDinas Cipta Karya & SDA Prov. SultengStructural Engineer & Fast-Track Execution SupervisorPaluAug 2024 to Sep 2024

    Scope. Planned and executed billboard structure rehabilitation against an accelerated completion target.

    Responsibilities
    • Prepared technical drawings and cost estimate (HPS) for the billboard structure
    • Supervised structural rehabilitation and finishing under a tight timeline

    Outcome. Met the 2-week accelerated target. Work finished ahead of the contract schedule.

    Interiors and fit-out

  • Library Building AssessmentMTsN 2 Kota PaluEducational Facility Assessment EngineerPaluSep 2024 to Sep 2024

    Scope. Carried out a condition assessment of the madrasah library building to support planning for educational facility upgrades.

    Responsibilities
    • Conducted structural and architectural assessment of the library building
    • Identified repair needs and facility upgrade requirements
    • Prepared cost estimate and intervention priorities

    Outcome. The assessment was completed with clear technical recommendations, giving the school a roadmap for library facility upgrades.

    Survey and design

  • Building Inspection & ValuationCentral Sulawesi Provincial BPBDBuilding Inspection & Valuation ExpertPaluSep 2024 to Sep 2024

    Scope. Conducted inspection and valuation of the BPBD building's condition to determine rehabilitation or replacement needs.

    Responsibilities
    • Carried out a comprehensive visual and structural inspection
    • Assessed the extent of damage and estimated rehabilitation value
    • Prepared technical recommendations to support asset management decisions

    Outcome. Delivered a comprehensive inspection and valuation report, giving management a technical data basis for budget planning.

    Survey and design

  • Demolition of the Dinas Perkebunan BuildingCentral Sulawesi ProvinceDemolition Engineer & HSE SupervisorPaluJul 2024 to Aug 2024

    Scope. Designed and supervised building demolition in accordance with Permen PUPR No.18/2021, with a focus on safety and construction waste management.

    Responsibilities
    • Prepared demolition methodology and cost estimate (HPS) per regulation
    • Supervised HSE implementation and systematic construction waste management

    Outcome. The post-earthquake structure was demolished safely with zero accidents. Full documentation was maintained for accountability.

    Buildings

  • Physical Condition Survey of Cultural Heritage SitesTojo Una-UnaCultural Heritage Survey SpecialistTojo Una-UnaAug 2024 to Aug 2024

    Scope. Conducted a physical condition survey of cultural heritage sites to support preservation efforts and heritage documentation.

    Responsibilities
    • Carried out survey and documentation of the physical condition of historical sites
    • Identified damage and threats to site integrity
    • Prepared conservation recommendations in line with heritage preservation principles

    Outcome. Delivered comprehensive site condition documentation, providing the data basis for the region's cultural heritage preservation program.

    Survey and design

  • Rehabilitation of BPOM Auditorium BuildingTechnical Management Expert & Cost ValidatorPaluJul 2024 to Aug 2024

    Scope. Engaged as technical expert to review a rehabilitation package uploaded via e-catalog, identifying critical errors in the consultant's cost estimate.

    Responsibilities
    • Conducted a comprehensive review of the project's cost estimate and technical drawings
    • Identified a critical error: reference prices sourced from outside Sulawesi (Java and Medan)
    • Recalculated the cost estimate using local market prices, resulting in a +16% adjustment (excluding VAT)

    Outcome. The original documentation would have deterred contractors from bidding due to unrealistic pricing. The cost correction ensured the project could proceed on a transparent, realistic basis.

    Buildings

  • Rear Segment Landscape DesignCentral Sulawesi Provincial BPKAD BuildingLandscape Design EngineerPaluJun 2024 to Aug 2024

    Scope. Designed the landscape for the rear segment of the BPKAD building, integrating functional and aesthetic elements.

    Responsibilities
    • Prepared DED, HPS, and technical specifications for the landscape works
    • Planned an integrated drainage system, pedestrian path, and green area

    Outcome. Delivered the landscape to the technical plan, ready for the office's outdoor activities.

    Sports and public

  • Warehouse DevelopmentDinas Cipta Karya dan Sumber Daya AirLead Design Engineer & Construction SupervisorPaluApr 2024 to Jul 2024

    Scope. Responsible for planning, DED, and cost estimation for new warehouse construction, incorporating reused post-disaster materials.

    Responsibilities
    • Prepared DED and cost estimates accounting for reuse of post-disaster materials
    • Designed a hybrid structural system: 1.7m reinforced concrete base with a 6m GIP steel frame above
    • Managed structural adjustments during execution, including added support columns for a sagging truss

    Outcome. Progress ran 41% ahead of the July 2024 schedule. Structural adjustments were managed without compromising safety.

    Buildings

  • Landscaping & Garden WorksOffice of Dinas Cipta Karya dan Sumber Daya AirLandscape Engineer & Site SupervisorPaluMay 2024 to Jul 2024

    Scope. Continued 2023 landscaping works with a focus on the rear garden area, including cost estimation and technical supervision.

    Responsibilities
    • Planned earthworks, a mini drainage system, and pipe installation
    • Supervised construction of the parking access ramp and garden boundary wall
    • Managed installation of portable bollards for flexible traffic control

    Outcome. Finished ahead of schedule despite coordination challenges from working at night to accommodate daytime parking use.

    Sports and public

  • Site SurveyKejaksaan Tinggi Clinic PlanningSurvey EngineerPaluMay 2024 to May 2024

    Scope. Conducted land survey and measurement for planning a clinic facility at the Central Sulawesi High Prosecutor's Office (Kejaksaan Tinggi).

    Responsibilities
    • Carried out field measurement to establish land boundaries and site physical conditions
    • Collected and documented site data to support clinic design planning

    Outcome. Survey results became the official reference for project preparation, ensuring accurate land allocation per regulatory requirements.

    Survey and design

  • Measurement & EvaluationPue Ndjidi Road Improvement Works, SigiField Evaluation EngineerSigiFeb 2024 to Feb 2024

    Scope. Assigned to carry out a measurement survey (opname) for a stalled road project at Opportunity Stage, uncovering 20.24% of works incomplete.

    Responsibilities
    • Conducted survey and quantity take-off of remaining work items within a single day under extreme heat conditions
    • Verified project progress against contractual obligations for reporting and accountability
    • Carried out field survey in high-risk locations: behind a >2.5m retaining embankment and on unstable slopes

    Outcome. Identified the project delay as stemming from contractor-internal issues. Measurement was completed in a single day despite extreme, hazardous conditions.

    Roads and bridges

202328 projects

  • Interior ProcurementRest Room & Lobby Backdrop, Dinas Cipta Karya & SDAInterior & Branding EngineerPaluOct 2023 to Dec 2023

    Scope. Planned and supervised interior procurement, including the Head of Department's rest room and a lobby backdrop featuring the CIKASDA logo.

    Responsibilities
    • Prepared DED, specifications, HPS, and schedule
    • Supervised construction of custom interior items, including built-in cabinetry and partition walls
    • Designed and supervised installation of the lobby backdrop with the CIKASDA logo and lettering

    Outcome. The CIKASDA logo introduced remains in use today as the institution's identity. The rest room was successfully concealed to meet requirements.

    Interiors and fit-out

  • Interior Works Phase IIDinas Cipta Karya & SDA OfficeReview Engineer & Interior SupervisorPaluSep 2023 to Dec 2023

    Scope. Reviewed Phase I works and prepared the Phase II interior continuation for inter-division rooms and meeting rooms.

    Responsibilities
    • Reviewed Phase I works and prepared Phase II planning documentation
    • Supervised interior works including finishing and furniture
    • Managed workshop activity in the previously unused basement

    Outcome. Completed the project efficiently within the contract period. Non-technical issues (worker apprehension, adhesive odor) were managed through guidance and schedule adjustment.

    Interiors and fit-out

  • Embankment, Drainage & Box Culvert DesignCova Lima, Timor-LesteInternational Hydraulic Structure Design EngineerCova Lima, Timor-LesteNov 2023 to Dec 2023

    Scope. International design consultancy: designed a comprehensive flood control and drainage system for an infrastructure project in Cova Lima, Timor-Leste, marking a first international project assignment.

    Responsibilities
    • Designed an embankment with flood-retention capacity matched to site requirements
    • Prepared DED for an integrated drainage system suited to local topography and hydrology
    • Designed box culverts with hydraulic and structural calculations referencing SNI standards

    Outcome. Overcame limited field data through engineering judgment. Completed a first international project, broadening technical perspective across borders.

    Drainage and water

  • Indoor Sports Facility RehabilitationDinas Cipta Karya & SDASports Facility Rehabilitation EngineerPaluNov 2023 to Dec 2023

    Scope. Planned and supervised rehabilitation of an indoor sports facility, a former tennis court converted to futsal use.

    Responsibilities
    • Prepared DED, specifications, owner's estimate, and schedule for the rehabilitation
    • Supervised installation of safety netting and spandek wall cladding
    • Coordinated replacement of restroom doors and sanitation facility repairs

    Outcome. Adaptive reuse extended the infrastructure's service life. Safety and sanitation upgrades improved staff recreational use.

    Sports and public

  • Office Partition WorksDinas Cipta Karya & SDAOffice Partition EngineerPaluNov 2023 to Dec 2023

    Scope. Planned and supervised continued partition works across all division rooms, including detailed finishing.

    Responsibilities
    • Prepared DED, specifications, owner's estimate, and schedule
    • Supervised partition installation across all office divisions
    • Coordinated HPL finishing, glass framing, and signage placement

    Outcome. Completed the project one week ahead of schedule with no variation order. Night-shift work ensured uninterrupted office operations.

    Interiors and fit-out

  • Landscape WorksDinas Cipta Karya & SDA OfficeLandscape & Cultural Design EngineerPaluOct 2023 to Dec 2023

    Scope. Planned and supervised landscape works integrating functional elements with megalithic cultural ornamentation.

    Responsibilities
    • Prepared DED, specifications, owner's estimate, and schedule
    • Supervised planting installation, natural stone garden walls, and outdoor lighting
    • Coordinated construction of accessibility paths and Central Sulawesi megalithic ornaments

    Outcome. The megalithic ornamentation fell short of the design vision due to the contractor's limited grasp of cultural context; other landscape elements were completed successfully.

    Sports and public

  • Environmental InfrastructureDinas Cipta Karya & SDA OfficeEnvironmental Infrastructure EngineerPaluOct 2023 to Dec 2023

    Scope. Planned and supervised drainage and water management infrastructure works at the office complex.

    Responsibilities
    • Prepared DED, specifications, owner's estimate, and schedule for drainage and utilities
    • Supervised excavation works, drainage channel construction, and soak-away boxes
    • Coordinated installation of grilles, catch basins, and water storage elements

    Outcome. An owner-directed change (catch basin converted to storage tank) compromised infiltration function; the recommended correction was declined on budget grounds.

    Buildings

  • Interior DecorationWorkstation & Camouflage Partitions, BPKADPartition & Space Planning EngineerPaluOct 2023 to Dec 2023

    Scope. Planned and supervised procurement of workstation partitions and camouflage elements for the BPKAD interior.

    Responsibilities
    • Prepared DED, specifications, owner's estimate, and schedule within one week ahead of tender
    • Supervised installation of workstation partitions and camouflage elements
    • Managed variation order adjustments to balance over- and under-scoped items

    Outcome. Managed the complexity of multiple parallel packages through tight timeline coordination. Discrepancies between the DED and actual site conditions were resolved through scope adjustment.

    Interiors and fit-out

  • Interior DecorationWindows & Doors, BPKAD OfficeInterior Procurement EngineerPaluOct 2023 to Dec 2023

    Scope. Planned and supervised procurement of windows and doors for the BPKAD office interior decoration works.

    Responsibilities
    • Prepared DED, specifications, owner's estimate, and schedule within one week ahead of tender
    • Supervised window and door installation for the office interior
    • Coordinated scope adjustments arising from architectural design changes

    Outcome. Managed dependency on the BPKAD Phase II architectural package through timeline coordination, completing the project efficiently once the architectural phase concluded.

    Interiors and fit-out

  • Stationery Warehouse ConstructionBPKAD Central Sulawesi ProvinceWarehouse Construction SupervisorPaluNov 2023 to Dec 2023

    Scope. Supervised construction of a stationery warehouse for BPKAD, addressing documentation that had bypassed review.

    Responsibilities
    • Supervised daily construction activity and ensured compliance with design documents
    • Coordinated resolution of quantity and specification discrepancies
    • Monitored execution progress and supported handover documentation

    Outcome. Resolved multiple variation orders and addenda required due to double-counted volumes in the consultant's documents; contractor integrity ensured transparent correction.

    Buildings

  • Office Building Construction Phase IIBPKAD Central Sulawesi ProvinceReview Engineer & Construction SupervisorPaluJun 2023 to Dec 2023

    Scope. Reviewed planning documents and supervised Phase II construction of the BPKAD building, with a focus on architectural and MEP works.

    Responsibilities
    • Reviewed DED and Engineer's Estimate from the previous phase for consistency
    • Supervised daily construction activity and monitored contractor progress
    • Coordinated resolution of technical and contractual issues with stakeholders

    Outcome. Resolved financial reconciliation through a detailed inspection process, reaching completion despite multi-contractor coordination challenges.

    Buildings

  • Traditional House Construction Phase IIRumah Gadang, Minangkabau Family AssociationPlanning Reviewer & Construction SupervisorPaluMar 2023 to Oct 2023

    Scope. Reviewed the consultant's documents and supervised architectural, supporting-building, and landscape works for the continuation of the Rumah Gadang.

    Responsibilities
    • Reviewed drawings, documentation, and cost estimates from the design consultant
    • Supervised architectural finishing, including color and flooring material selection
    • Coordinated landscape works and the supporting building behind the Rumah Gadang

    Outcome. Coordination with a professional contractor kept progress running smoothly. Owner-driven design changes were managed through an addendum without disrupting the main schedule.

    Buildings

  • Aisyiyah Orphanage Facility DesignSocial Infrastructure Design Engineer (Pro Bono)Sigi, Central SulawesiSep 2023 to Oct 2023

    Scope. Prepared design and technical documentation for an orphanage facility as a pro bono contribution to improving welfare for orphaned children.

    Responsibilities
    • Prepared DED, bill of quantities, and technical specifications for the orphanage facility
    • Developed a functional layout accommodating residents' needs
    • Ensured the design met safety and comfort standards for children

    Outcome. Delivered a functional design meeting the social institution's needs, a pro bono contribution reflecting the engineer's civic responsibility.

    Survey and design

  • Office Building MaintenanceDinas Cipta Karya & SDABuilding Maintenance EngineerPaluAug 2023 to Oct 2023

    Scope. Planned and supervised comprehensive maintenance covering architectural, electrical, sanitation, and mechanical works.

    Responsibilities
    • Carried out surveys and prepared DED, specifications, owner's estimate, and schedule
    • Supervised architectural repairs: flooring, ceilings, and interior finishes
    • Coordinated electrical, plumbing, and septic system rehabilitation

    Outcome. Addressed extensive damage within a limited budget, with progress ahead of schedule despite complex septic repair challenges.

    Buildings

  • Public FacilitiesPaneki Scout CampgroundRemote Facilities Design EngineerPanekiMay 2023 to Sep 2023

    Scope. Planned and supervised construction of toilet facilities and supporting utilities for a campground at a remote site.

    Responsibilities
    • Carried out surveys and prepared DED, specifications, cost estimates, and schedule
    • Developed 7 alternative toilet designs to accommodate owner preferences
    • Coordinated local labor engagement and supervised sanitation installation

    Outcome. Completed the project using local labor. Remote-site access and budget constraints were managed through a 'just-fit' design approach.

    Sports and public

  • Port Development PlanningToli-Toli PortPort Facilities Planning EngineerToli-ToliJun 2023 to Aug 2023

    Scope. Prepared planning documents for a comprehensive upgrade of Toli-Toli Port facilities.

    Responsibilities
    • Prepared plans for the terminal, canteen, guard post, prayer room, staff housing, road asphalting, fencing, and jetty demolition
    • Assessed the extent of existing damage to determine rehabilitation value
    • Integrated HSE considerations for the demolition and construction phases

    Outcome. Completed the planning without a direct site survey, relying on photos, sketches, and secondary documentation, a resourceful approach that overcame data limitations.

    Roads and bridges

  • Fence RehabilitationCentral Sulawesi Provincial PKK OfficeAsset & Rehabilitation EngineerPaluMay 2023 to Aug 2023

    Scope. Planned and supervised fence rehabilitation, including asset write-off, demolition, and new construction with signage.

    Responsibilities
    • Prepared DED, specifications, HPS, schedule, and asset write-off documents
    • Supervised demolition of the old fence and construction of the new fence and gate
    • Verified work claims on site, including soil backfill and foundation depth

    Outcome. Site verification uncovered discrepancies in the contractor's claims. Technical integrity was upheld through direct inspection despite administrative pressure.

    Buildings

  • Canopy DesignKindergarten Yard, Palu CityCanopy Design Engineer (Personal Contribution)PaluAug 2023 to Aug 2023

    Scope. Prepared DED and cost estimates for a donated canopy sheltering the kindergarten's play yard.

    Responsibilities
    • Prepared the canopy layout and cost estimate to fit the donor's funding capacity
    • Provided technical advice on feasibility and cost-effectiveness
    • Recommended a mutual self-help (gotong royong) approach for construction implementation

    Outcome. Delivered a practical design fitting the donor's funding model, with a natural-landscape alternative recommended for longer-term benefit.

    Survey and design

  • Standard Cost Budget PlanningCentral Sulawesi ProvinceLead Cost Standardization EngineerPaluJun 2023 to Jul 2023

    Scope. Designed and formulated the Standard Cost Budget for the entire Central Sulawesi Province in response to a request from BPKAD and the KPK.

    Responsibilities
    • Designed a master formula standardizing costs across sectors: road networks, physical construction, interiors, forensic testing, planning documents, and state buildings
    • Developed a per-square-meter pricing model for building types ranging from single-story to high-rise, covering new construction, rehabilitation, renovation, and damage repair
    • Compiled formulas for education, office, health, defense, state housing, fencing, and landscape buildings

    Outcome. Completed the project independently despite its complexity repeatedly freezing laptop and PC hardware. The resulting formula became a national reference used across provinces in Indonesia.

    Survey and design

  • Sanitation & Ablution Facility DesignPondok Tahfidz SunjuSanitation Design Engineer (Personal Contribution)SunjuJul 2023 to Jul 2023

    Scope. Designed washroom and ablution facilities for an Islamic boarding school as a social contribution toward improved student infrastructure.

    Responsibilities
    • Prepared the facility layout and hydraulic calculations
    • Developed a practical, efficient design for rapid implementation
    • Completed the design overnight to meet the community's urgent need

    Outcome. Delivered the design overnight, ready for implementation, as a pro-bono professional contribution to the religious education institution.

    Drainage and water

  • Landscape and Fence RehabilitationDinas Cipta Karya & SDA OfficeLandscape & Facade Design EngineerPaluMar 2023 to Jul 2023

    Scope. Planned and supervised rehabilitation of the front fence and office frontage, integrating Kaili cultural ornamentation.

    Responsibilities
    • Carried out surveys, prepared DED and specifications, and assessed asset demolition value
    • Supervised fence rehabilitation and construction of the office name wall
    • Coordinated integration of Kaili cultural ornamentation into the facade and frontage

    Outcome. Reached 60%+ progress at contract midpoint and 100% within three weeks. Upgraded the office's visual identity with local cultural elements.

    Sports and public

  • Office Name Wall ConstructionDinas Cipta Karya & SDAFacade & Signage EngineerPaluMay 2023 to Jun 2023

    Scope. Planned and supervised construction of an office name wall to modernize the facade with ACP cladding and acrylic signage.

    Responsibilities
    • Prepared DED, specifications, owner's estimate, and schedule for the facade and signage works
    • Supervised ACP cladding installation on the second-floor facade
    • Coordinated fabrication and installation of acrylic signage with a lighting system

    Outcome. Completed the project in under one week, well ahead of schedule, with HSE maintained throughout work at height.

    Interiors and fit-out

  • Badminton Sports Hall MaintenancePalu CitySports Facility EngineerPaluApr 2023 to Jun 2023

    Scope. Planned and supervised upgrades to the badminton hall to improve playing quality and comfort.

    Responsibilities
    • Carried out surveys and prepared DED, specifications, and owner's estimate
    • Supervised replacement of ceramic flooring and installation of new court carpeting
    • Coordinated lighting upgrades and wall cladding for optimal visibility

    Outcome. Completed the project ahead of schedule with no variation order, significantly upgrading the facility's comfort and playing standard.

    Sports and public

  • Fence Survey & DesignJl. Agus Salim, PaluSurvey & Design Engineer (Personal Project)PaluJun 2023 to Jun 2023

    Scope. Carried out an independent survey and prepared a fence design for a corner lot at a strategic intersection.

    Responsibilities
    • Carried out a site survey and prepared DED, specifications, and cost estimate
    • Designed a curved fence alignment matching the street corner geometry
    • Documented existing building conditions and provided redevelopment recommendations

    Outcome. Completed the design within one week. The site, now a building materials store, reflects the early planning contribution to the land's development.

    Survey and design

  • Landscape UpgradeOfficial Residence of the Central Sulawesi Head ProsecutorLandscape & Drainage EngineerPaluApr 2023 to Apr 2023

    Scope. Planned and supervised landscape works and drainage repair at the Kajati official residence.

    Responsibilities
    • Carried out the survey and prepared the DED, HPS, and specifications
    • Supervised canopy installation to prevent water intrusion
    • Managed drainage system construction that eliminated garage flooding

    Outcome. Resolved habitability issues through an integrated drainage, canopy, and landscape solution.

    Sports and public

  • Public Facility RehabilitationGawalise Stadium, Palu CityLead Design Engineer & SupervisorPaluJan 2023 to Apr 2023

    Scope. Planned and supervised rehabilitation of severely damaged sanitation facilities and supporting infrastructure at the stadium.

    Responsibilities
    • Carried out surveys and prepared DED, specifications, and owner's estimate
    • Supervised toilet replacement, plumbing rehabilitation, and construction of a new septic tank
    • Managed variation order works: new gate, fencing, and deck slab for fire access

    Outcome. Completed rehabilitation despite execution coinciding with Ramadan. The new water system operates with high-capacity pumps to overcome site elevation.

    Sports and public

  • Resort Design & Cost EstimateHead of DepartmentConcept Design Engineer & Cost EstimatorCentral SulawesiFeb 2023 to Mar 2023

    Scope. Prepared a design concept and cost estimate for a modest resort facility.

    Responsibilities
    • Developed the architectural concept and layout for the resort facility
    • Prepared an accurate, realistic construction cost estimate
    • Prepared technical documentation to support decision-making

    Outcome. Delivered a functional design and cost estimate matched to the client's needs through an efficient approach.

    Survey and design

  • Landscape Enhancement Phase II (Aviary)Vice Governor's Official ResidenceLandscape & Aviary Design EngineerPaluJan 2023 to Feb 2023

    Scope. Planned and supervised aviary landscaping works at the Vice Governor's official residence complex.

    Responsibilities
    • Prepared DED for the aviary facility, including water features and mechanical systems
    • Supervised planting works, water installation, and placement of large plants
    • Managed logistics coordination for oversized materials through restricted access

    Outcome. Completed the project one week ahead of schedule with no variation order. Large-material logistics challenges were resolved through creative access planning.

    Sports and public

202217 projects

  • Warehouse & Sports Facility MaintenanceDinas Cipta Karya & SDA OfficeFacility Maintenance EngineerPaluOct 2022 to Dec 2022

    Scope. Planned maintenance of the warehouse and sports facilities to preserve operational and recreational function.

    Responsibilities
    • Assessed the condition of the warehouse and sports facilities
    • Prepared a repair plan and cost estimate
    • Supervised maintenance execution to safety standards

    Outcome. Maintained the facilities in good condition, with the warehouse fully operational and sports facilities ready for staff use.

    Sports and public

  • Rehabilitation & Restoration of Souraja House, Kampung LereCultural Heritage Restoration SpecialistPaluJun 2022 to Dec 2022

    Scope. Reviewed and supervised restoration of the Souraja (traditional Kaili house) as a post-disaster cultural heritage preservation effort.

    Responsibilities
    • Reviewed the restoration DED with attention to historical value and authenticity
    • Verified traditional construction techniques and local materials
    • Supervised the restoration process to preserve original structural integrity and aesthetics

    Outcome. Souraja was restored with its cultural and historical value preserved. The building now serves as a center for Kaili traditional activities.

    Buildings

  • Side Fence ConstructionDeputy Governor's Official ResidenceFence & Security Infrastructure EngineerPaluOct 2022 to Dec 2022

    Scope. Planned side fence construction to complete the security system and perimeter aesthetics of the official residence.

    Responsibilities
    • Prepared the fence DED integrated with the existing landscape design
    • Designed foundation and pilaster structures matched to soil conditions
    • Supervised construction to high security standards

    Outcome. The fence was completed with seamless integration into the landscape. The official residence's security perimeter now holds consistent aesthetics.

    Buildings

  • Rumah Gadang Construction, Phase IMinangkabau Family AssociationCultural Heritage Construction ReviewerPaluJun 2022 to Dec 2022

    Scope. Reviewed the DED and supervised construction of the Rumah Gadang as a symbol of Minangkabau cultural heritage in Palu City.

    Responsibilities
    • Reviewed planning documents to verify authenticity of Minangkabau architecture
    • Verified cost estimates and suitability of traditional materials
    • Supervised construction progress with close attention to distinctive architectural detail

    Outcome. Rumah Gadang Phase I was completed with architectural authenticity preserved. The project stands as a Minangkabau cultural landmark in Central Sulawesi.

    Buildings

  • Supply of Divisional Workspace PartitionsDinas Cipta Karya & SDA OfficeOffice Space Division EngineerPaluOct 2022 to Dec 2022

    Scope. Planned partition supply to divide divisional workspace into more functional areas.

    Responsibilities
    • Prepared workspace division layout to suit each division's needs
    • Calculated partition requirements and cost estimate
    • Supervised installation with attention to accessibility and circulation

    Outcome. The workspace was organized with functional partitioning. Staff privacy and focus improved without compromising collaboration.

    Interiors and fit-out

  • Rehabilitation of the 4th-Floor Meeting RoomDinas Cipta Karya & SDA OfficeMeeting Room Renovation EngineerPaluOct 2022 to Dec 2022

    Scope. Planned rehabilitation of the 4th-floor meeting room to increase capacity and comfort for meeting activities.

    Responsibilities
    • Prepared the renovation DED with a multimedia system upgrade
    • Planned furniture layout and optimal lighting
    • Supervised finishing works and equipment installation

    Outcome. The meeting room was upgraded with modern facilities. Capacity and comfort improved to support coordination activities.

    Buildings

  • Building MaintenanceBidarawasia Women's BuildingBuilding Maintenance Planning EngineerPaluSep 2022 to Dec 2022

    Scope. Planned a maintenance program for the Bidarawasia building to extend service life and preserve operational function.

    Responsibilities
    • Conducted building condition assessment and identified defects
    • Prepared preventive and corrective maintenance plans
    • Developed cost estimates and a maintenance schedule

    Outcome. A systematic maintenance program was delivered. The building's condition is maintained through timely intervention on critical components.

    Buildings

  • Landscape DesignDeputy Governor's Official ResidenceOfficial Residence Landscape ArchitectPaluOct 2022 to Dec 2022

    Scope. Planned a comprehensive landscape design for the Deputy Governor's official residence to a representative standard.

    Responsibilities
    • Prepared a landscape master plan with functional and aesthetic zoning
    • Designed irrigation, outdoor lighting, and hardscape systems
    • Selected vegetation suited to the official residence's formal character

    Outcome. The landscape was completed to a high representative standard. The official residence now has grounds reflecting beauty and stature.

    Sports and public

  • Pavilion Interior WorksDeputy Governor's Official ResidenceVIP Interior Design EngineerPaluOct 2022 to Dec 2022

    Scope. Planned interior renovation of the guest pavilion to VIP standard for receiving important guests.

    Responsibilities
    • Developed an elegant, representative interior concept
    • Prepared working drawings for furniture, finishes, and decoration
    • Coordinated selection of premium materials to official residence standards

    Outcome. The pavilion was upgraded with a premium interior. The facility is now fit to receive VIP guests to a high protocol standard.

    Interiors and fit-out

  • Interior DEDDinas Cipta Karya dan Sumber Daya AirInterior Design EngineerPaluAug 2022 to Dec 2022

    Scope. Prepared a comprehensive DED for office interior renovation, focused on functionality and professional aesthetics.

    Responsibilities
    • Developed an interior design concept matched to operational needs
    • Prepared detailed working drawings for furniture, partitions, and finishes
    • Integrated MEP systems with the interior design

    Outcome. A comprehensive interior DED was delivered. The design accommodates every division's needs to a high professional standard.

    Interiors and fit-out

  • Rehabilitation of Green Open Space (RTH)Tavanuka Sub-DistrictGreen Open Space DesignerPaluOct 2022 to Dec 2022

    Scope. Planned rehabilitation of a green open space to improve environmental quality and public space in Tavanuka Sub-District.

    Responsibilities
    • Prepared an RTH master plan integrating vegetation and public facilities
    • Designed park irrigation and drainage systems
    • Developed an environmentally friendly, sustainable design

    Outcome. The green open space was delivered as a quality public space. Residents gained a green recreational facility that improves quality of life.

    Sports and public

  • Supply of Glass PartitionsDeputy Governor's Official ResidenceGlass Partition Procurement EngineerPaluNov 2022 to Dec 2022

    Scope. Planned supply and installation of glass partitions to modernize the official residence's interior.

    Responsibilities
    • Prepared technical specification for tempered glass partitions
    • Calculated material requirements and cost estimate
    • Supervised installation to glass safety standards

    Outcome. Glass partitions were installed to a high safety standard. The official residence's interior is now more modern and light-filled.

    Interiors and fit-out

  • Gazebo, Pond, Aviary & Supporting FacilitiesDeputy Governor's Official ResidenceLandscape Planner & Construction SupervisorPaluOct 2022 to Dec 2022

    Scope. Planned and supervised construction of decorative landscape elements, including a gazebo, fish pond, and aviary, to complete the residence complex.

    Responsibilities
    • Prepared the DED and designed the gazebo structure using high-quality materials
    • Designed and supervised pond construction with water circulation and filtration systems
    • Planned and supervised aviary construction with habitat suited to ornamental birds

    Outcome. The premium landscape facilities were delivered as planned. Close supervision ensured optimal construction quality.

    Drainage and water

  • Garden & Podium WorksDinas Cipta Karya & SDA OfficeLandscape Planner & Site SupervisorPaluOct 2022 to Dec 2022

    Scope. Planned and supervised garden works and podium construction at the office frontage to improve the public area's aesthetics and function.

    Responsibilities
    • Prepared the DED and garden plan with vegetation suited to local climate
    • Designed and supervised construction of the office frontage podium
    • Supervised planting works and hardscape element installation

    Outcome. The garden and office podium were delivered as planned. The office frontage is now more representative and functional.

    Sports and public

  • Supply of Decorative GrillesDinas Cipta Karya & SDA OfficeFacade Decoration EngineerPaluOct 2022 to Dec 2022

    Scope. Planned supply and installation of decorative grilles to enhance the office building's facade aesthetics.

    Responsibilities
    • Designed grille patterns matched to the building's character
    • Calculated material requirements and technical specification
    • Supervised installation with attention to finishing detail

    Outcome. Decorative grilles were installed, strengthening the building's visual identity. The office facade is now more distinctive and representative.

    Interiors and fit-out

  • Rehabilitation of the Central Sulawesi Provincial PKK BuildingRehabilitation Planning EngineerPaluApr 2022 to Jun 2022

    Scope. Planned rehabilitation of the Provincial PKK building, focused on improving building function and aesthetics.

    Responsibilities
    • Conducted existing-condition assessment and identified defects
    • Prepared DED, bill of quantities, and technical specification for rehabilitation
    • Sequenced works to minimize disruption to operations

    Outcome. A complete rehabilitation planning package was delivered. The PKK building's function was upgraded to meet organizational needs.

    Buildings

  • Supply and Installation of 4th-Floor Office PartitionsDinas Cipta Karya & SDAInterior Space Planning EngineerKota Palu, Sulawesi TengahApr 2022 to Jun 2022

    Scope. Planned and supervised partition installation to optimize the workspace layout on the office building's 4th floor.

    Responsibilities
    • Prepared partition layout and material cost estimate
    • Supervised installation of glass partitions and wall panels
    • Ensured integration with existing electrical and HVAC systems

    Outcome. The workspace was upgraded with modern partitioning. Staff productivity improved through a better-organized layout.

    Interiors and fit-out

20213 projects

  • Budget Planning & Drawings for Type 36 BTN HousingResidential Design Drafter & Cost EstimatorSulawesi TengahAug 2021 to Dec 2021

    Scope. Prepared working drawings and cost estimates for a Type 36 BTN standard residential house.

    Responsibilities
    • Prepared architectural and structural drawings to BTN standard
    • Calculated quantities and construction cost estimate
    • Ensured the design met subsidized housing technical requirements

    Outcome. Planning documentation was delivered to BTN standard. The efficient design maximized space within Type 36 constraints.

    Survey and design

  • Design of a Riverside House with Fish PondBuol RegencyResidential & Aquaculture Design EngineerKabupaten Buol, Sulawesi TengahMay 2021 to Jun 2021

    Scope. Designed a riverside residence with an integrated fish pond facility to support family income.

    Responsibilities
    • Developed a house design in harmony with the river environment
    • Designed a fish pond with a natural water circulation system
    • Prepared cost estimate and local material specification

    Outcome. The design was completed integrating residential and fish farming functions. A creative solution made use of the riverside site's potential.

    Drainage and water

  • Topographic Survey of Talise Salt Ponds (Post-Tsunami)Post-Disaster Survey EngineerTalise, Kota PaluFeb 2021 to Apr 2021

    Scope. Conducted a topographic survey of the salt pond area following the tsunami to support infrastructure reconstruction and recovery.

    Responsibilities
    • Performed topographic measurement accounting for post-disaster morphological change
    • Documented the physical condition of remaining land and infrastructure
    • Prepared a situation map as the basis for rehabilitation planning

    Outcome. The post-disaster survey documented significant land morphology change. The data became the basis for restoring salt production infrastructure.

    Drainage and water

More on GitHubFlutter, Dart and Rust packages, plus experimentsgithub.com/saimskywalker